McGhee Tyson Airport 510 Center

About this Project

Value:  $15,800,000
Year Completed:  2013
Location:  Alcoa, TN
Area:  89,200 SF
Owner:  Metropolitan Knoxville Airport Authority
Architect:  The LPA Group Incorporated
Delivery Method:  General Contractor / Lump Sum
Points of Pride:

  • USGBC LEED Silver Certification

Denark served as the General Contractor on the McGhee Tyson Airport SRES/Maintenance Center project that consisted of the construction of 89,200 SF to include snow equipment storage, a vehicle maintenance facility, and other associated facilities. The project encompassed the complete building construction of all components of the SRES/Maintenance center site, including a fuel and wash island, hazmat storage buildings, two tensile membrane structures, concrete and asphalt paved areas, site utilities, and a geothermal well field. Construction of the site included retaining walls, security fencing, and access controllers that were integrated with the airports security system.

“The facility contains a number of sophisticated, state-of-the-art systems including geothermally-assisted radiant floor heating, vehicle maintenance and lift equipment and data, life safety and security systems that presented challenges in construction. The work had to comply with a multitude of state and federal regulations. In performing the work, the air operations area security perimeter also had to be maintained. Denark’s team did a great job in meeting these challenges and delivering a successful completion of the project.”

DOUG HILL

PROJECT MANAGER, METROPOLITAN KNOXVILLE AIRPORT AUTHORITY, MCGHEE TYSON AIRPORT